DE Contact

Our method

Nobody knows the future. Your investment pays off anyway: in 4 steps.

Power prices, grid fees, interest rates, subsidies: nobody knows how they will develop. That is why we do not plan on one forecast. We calculate your energy system across tens of thousands of possible futures and design it to perform best across all of them. Even when things turn out badly.

  1. 1 Digital twinWe model your energy system digitally, with all its plants, loads and options. Every calculation builds on this model.
  2. 2 Possible futuresFor every uncertain factor, such as power prices, we model possible developments. Together they make tens of thousands of futures.
  3. 3 Robust designWe design your systems to perform best across all futures, not just in one forecast.
  4. 4 EconomicsWe run the business case through every future. So you know whether your investment pays off, and how certain that is.

Step 1 · Digital twin

First, we rebuild your energy system. As a digital twin.

With everything you have today: site, lines, loads, tariffs. And with everything you are considering: PV, wind, storage, heat storage, electric vehicles. Then we calculate which options really pay off.

  • Power
  • Gas
  • Heat
  • Solar

BTM – or FTM. Your energy park.

Merchant, subsidies, co-location: the same principle, the same robustness.

Step 2 · Possible futures

Whether your investment pays off depends on many factors.

From power prices and grid fees to interest rates and subsidies.

1 For every project, we decide which factors we treat as uncertain. For those, we calculate with scenarios. For all others, one forecast is enough.

2 For every uncertain factor, we model several developments. Combined, they result in many possible futures.

Step 3 · Robust design

Then we look for the design that performs best across all futures.

For comparison: the conventional design, based on one forecast.

The result: a design that does not just look good in one forecast, but holds up in almost every future. The conventional design can slip into the red in unfavourable futures.

Step 4 · Scenario analysis

Finally, we calculate the economics in every future.

Each variant gets a distribution instead of a single number.

You see return, payback period and net present value across all futures, and how often the investment ends up in the red. We make the unfavourable case tangible with P90 or P95: the value reached at least in 90 or 95% of futures. This is exactly the metric banks use to size loans, for example via the debt service coverage ratio (DSCR) in the P90 case.

Conventional design for comparison Optimised for one forecast PVStorage A loss in 7% of futures. At least −0.9% with 95% probability
min. −0.9%
Robust design Optimised for all futures PVStorage No loss in any future. At least +4.2% with 95% probability
min. +4.2%

Return p.a. · each dot one future

Even when things turn out badly, your investment stays in the black. That is how we save your business case.

We calculate the return you will reach at least, with 95% probability.

The method in brief

Making good decisions, even when the future is uncertain.

The problem

Whether an investment in PV, battery storage, a heat pump or e-mobility pays off depends on variables nobody can predict with certainty: power prices and their fluctuations, grid fees, the CO₂ price, interest rates, subsidies and your own consumption.

Conventional planning

The usual approach is to design the systems for one forecast and perhaps recalculate three scenarios. The result is only right if the forecast comes true.

Tens of thousands of futures instead of one forecast

For every uncertain factor, we model possible developments and combine them into tens of thousands of futures.

A design that holds up in every future

We look for the design that performs best across all these futures, not the one that looks best in a single forecast. So we do not just evaluate a finished plan across many scenarios: we design the systems themselves this way. Experts call this robust optimisation.

The result

For every variant, you see return and risk across all futures, for example the return reached at least with 95% probability (P95), instead of a number that is only right in one forecast.

Four ways to deal with uncertainty.

One forecastThree scenariosRunning many scenariosRobust design
Futuresonethree (best, base, worst)manytens of thousands
Designed forthe forecastthe middle casethe forecast, checked afterwardsall futures
What you learnone numbera rangehow risky the planned variant iswhich variant pays off most reliably, and how reliably

For everyone who makes an energy project possible

Every perspective. One calculation.

An energy project needs many people to say yes. We calculate it once, across all futures, and show each of them the number that matters to them. So everyone relies on the same assumptions: from the investment through delivery to financing.

One shared model

  • the same assumptions
  • the same futures
  • transparent for everyone

Figures: illustrative example values.

Why you can trust us

2018Since then, we have been researching and calculating robust energy systems.
2Doctorates in engineering at TU Darmstadt.
Tens of thousandsof futures, calculated in every project.

Used and supported by

  • Honda Research Institute Europe
  • HIGHEST, the innovation and start-up centre of TU Darmstadt
  • House of Energy, Forum Startup+
  • SET Hub, a dena project
  • EXIST, business start-ups from industry and science
  • Co-funded by the European Union

FAQ

Power prices, grid fees, subsidies: everything is uncertain. How am I supposed to decide on an investment?
Not on the basis of a single forecast. Run your options through many possible developments and choose the variant that performs best across all of them. That is exactly what we do: we model your energy system as a digital twin, calculate it across tens of thousands of futures and design the systems so that they pay off even when things turn out badly.
What if power prices fall and my storage no longer pays off?
Those are exactly the futures we include: falling and rising power prices, narrower or wider price spreads, different grid fees. You then see in how many futures the storage pays off, and how large it may be so that it still pays off when prices fall.
How certain can I be that my investment will pay off?
We show you that as a number: for example the return you reach at least in 95% of futures, and how often the investment ends up in the red. So you know not only what comes out on average, but also what you can rely on.
How large should PV and storage be if I do not know how prices will develop?
Large enough for the combination to perform best across all futures. A system that earns the most in one forecast is often too large or too small when things turn out differently. We size PV, storage and all other options together so that they hold up in as many futures as possible.
Should I rather wait until it is clearer how things will develop?
Waiting is a decision too, and it has a cost: as long as you wait, you keep paying today's energy costs. With a calculation across all futures, you decide today on a basis that holds up even if things turn out differently.
Isn't it enough to calculate a best, base and worst case?
Three scenarios show three points, but not how likely they are or what lies in between. And the design remains the one from the base case. We calculate tens of thousands of futures and design the systems across all of them.
I already have a calculation from the supplier. What does your calculation add?
An independent second opinion. We do not sell any systems and work only on your behalf. We run the offered variant and alternatives on the same basis across all futures and show how reliably each one pays off.
Isn't a design that holds up everywhere more cautious, with a lower return?
In the one forecast, often slightly lower. In return, it does not collapse in unfavourable futures. You see both side by side and decide how much return you are willing to trade for how much certainty.
What is robust optimisation?
A method that does not look for the design that looks best in a single forecast, but for the one that performs best across all the futures considered. Robust means: the investment pays off even when things turn out badly.
What is a digital twin?
A computational model of your energy system: all plants, energy flows, loads and tariffs as they are today, and all the options that could be relevant for you. Every calculation builds on it.
What do P90 and P95 mean?
Metrics for the unfavourable case. P90 is the value reached at least in 90% of futures, P95 the value in 95% of futures. For companies, this is the return they can rely on. Banks use it to size loans, for example via the debt service coverage ratio (DSCR) in the P90 case.
Which projects is the method suitable for?
For businesses investing in PV, wind, battery storage, heat pumps, CHP or e-mobility, and for energy parks with storage, including merchant marketing or co-location. And for everyone who plans, builds or finances such projects.

A thousand futures become one decision. Yours.

Tell us what you are planning. We will get back to you within one working day.

Prefer email: info@zenules.de

Required field