For project developers
Every decision about your project. Calculated across all futures.
Grid connection, offtake, sale, operation: with our tool you model your project once and run it across tens of thousands of futures. You see what it earns and how certain that is.
One model for the whole project
From first layout to repowering. One calculation.
Four decisions, each with its own risk. We show them with one example: a solar park with storage behind a 12 MW grid connection.
Phase 1 · Planning
What do I build behind my grid connection?
How much PV, how large the storage, for which markets: it all depends on each other. And the grid operator sets conditions, such as no charging from the grid or limited export around midday.
The tool sizes the assets optimally under these conditions. And it shows what each condition costs.
So you know whether to accept a condition, renegotiate it or look for a different grid connection.
Optimal design
Project value
Phase 2 · Tender and offtake
CfD, PPA or merchant?
From 2027 the two-sided CfD arrives: if prices rise, you hand back revenue. A PPA shifts part of the risk, on merchant you carry all of it yourself. And you have to estimate the bid price for the tender.
The tool calculates every offtake route across all futures. You see expected value and range side by side.
Plus the bid price at which your project still holds up in the bad case.
Phase 3 · Sale
What is my project worth?
At ready-to-build stage you sell to an investor. They run the numbers on their own assumptions and make an offer. Until now, all you have against it is a single number.
The tool shows the project value as a range across all futures. The offer lies somewhere within it.
You see where it lies and how much headroom is left.
Phase 4 · Operation
Continue, repower or retrofit storage?
When the subsidy runs out, you have three routes. They differ not only in expected return but also in risk. Repowering ties up a lot of capital, continued operation depends entirely on the power price.
The tool puts all three routes side by side, each with expected value and range.
There is no single best option. There is the one that fits your appetite for risk.
Your project in the tool.
Site and assets.
PV, wind and storage with your project's weather and site data, modelled once and in full.
Grid connection with conditions.
Connection capacity, time windows, grid charging, connection cost contribution: every condition enters the design as a constraint.
Offtake.
CfD, PPA, merchant or a mix, plus the markets in which the storage earns revenue.
Calculated across all futures.
Design, bid price and project value, each with its range. Every new variant is set up in seconds.
Why you can trust us
Used and supported by
FAQ
How do you assess the merchant risk of a battery?
What happens in a demo?
Which projects can I model?
How do I model grid connection conditions?
Can we bring our own price forecasts?
Can investor and bank work with the same model?
Calculate your project across all futures.
In a 30-minute demo you see how the tool handles a real project. We will get back to you within one working day.