DE Contact

For project developers

Every decision about your project. Calculated across all futures.

Grid connection, offtake, sale, operation: with our tool you model your project once and run it across tens of thousands of futures. You see what it earns and how certain that is.

Project return of a solar park with storage across all futures. Illustrative example.

One model for the whole project

From first layout to repowering. One calculation.

Four decisions, each with its own risk. We show them with one example: a solar park with storage behind a 12 MW grid connection.

Phase 1 · Planning

What do I build behind my grid connection?

How much PV, how large the storage, for which markets: it all depends on each other. And the grid operator sets conditions, such as no charging from the grid or limited export around midday.

The tool sizes the assets optimally under these conditions. And it shows what each condition costs.

So you know whether to accept a condition, renegotiate it or look for a different grid connection.

Grid operator conditions

Optimal design

PV
Storage

Project value

with these conditions
Cost of the conditions

Switch the conditions on and off. Project value as net present value, averaged over all futures. Example values.

Phase 2 · Tender and offtake

CfD, PPA or merchant?

From 2027 the two-sided CfD arrives: if prices rise, you hand back revenue. A PPA shifts part of the risk, on merchant you carry all of it yourself. And you have to estimate the bid price for the tender.

The tool calculates every offtake route across all futures. You see expected value and range side by side.

Plus the bid price at which your project still holds up in the bad case.

CfD bid price for a project return above 7% in 95% of futuresfrom 4.9 ct/kWh
Project return per offtake route across all futures, bars from 5% to 95%. Example values.

Phase 3 · Sale

What is my project worth?

At ready-to-build stage you sell to an investor. They run the numbers on their own assumptions and make an offer. Until now, all you have against it is a single number.

The tool shows the project value as a range across all futures. The offer lies somewhere within it.

You see where it lies and how much headroom is left.

Project value across all futures with an investor's offer. Example values.

Phase 4 · Operation

Continue, repower or retrofit storage?

When the subsidy runs out, you have three routes. They differ not only in expected return but also in risk. Repowering ties up a lot of capital, continued operation depends entirely on the power price.

The tool puts all three routes side by side, each with expected value and range.

There is no single best option. There is the one that fits your appetite for risk.

Net present value over the remaining lifetime of an 8 MWp solar park whose subsidy is ending. Bars from 10% to 90%. Example values.

Your project in the tool.

  1. Site and assets.

    PV, wind and storage with your project's weather and site data, modelled once and in full.

  2. Grid connection with conditions.

    Connection capacity, time windows, grid charging, connection cost contribution: every condition enters the design as a constraint.

  3. Offtake.

    CfD, PPA, merchant or a mix, plus the markets in which the storage earns revenue.

  4. Calculated across all futures.

    Design, bid price and project value, each with its range. Every new variant is set up in seconds.

More about the method

Why you can trust us

2018Since then we have been researching and calculating robust energy systems.
2PhDs in engineering at TU Darmstadt.
Tens of thousandsof futures, calculated in every project.

Used and supported by

  • Honda Research Institute Europe
  • HIGHEST, innovation and start-up centre of TU Darmstadt
  • House of Energy, Forum Startup+
  • SET Hub, a dena project
  • EXIST, business start-ups from science
  • Co-funded by the European Union

FAQ

How do you assess the merchant risk of a battery?
We calculate its revenues across tens of thousands of futures for power prices, spreads and grid fees, including how they depend on each other. You see expected value and range, for example the project return reached in at least 95% of futures. This lets you compare merchant, PPA and CfD on the same basis.
What happens in a demo?
In 30 minutes online, we show you the tool on an example project. You see how design, offtake and results fit together.
Which projects can I model?
PV, wind and battery storage, on their own or as a hybrid park sharing one grid connection (co-location). New projects as well as operating assets whose subsidy is running out.
How do I model grid connection conditions?
As constraints in the model: maximum export and import capacity, also staggered over time, a ban on grid charging, or costs such as the connection cost contribution. The tool sizes the assets optimally under these constraints.
Can we bring our own price forecasts?
Yes. Your forecast enters the model as an additional assumption. You decide whether it counts on its own or alongside the others.
Can investor and bank work with the same model?
Yes. Each party picks the assumptions that matter to them. What remains to be argued about is only the selection, not the calculation. More on the page for financiers.

Calculate your project across all futures.

In a 30-minute demo you see how the tool handles a real project. We will get back to you within one working day.

Prefer email: info@zenules.de

Required field